Princeton – Routine inspection conducted on 03-25-2025.
Critical: None observed.
Non-critical:
- Damaged ceiling tile related to leak. Physical facilities shall be maintained in good repair.
Princeton – Routine inspection conducted on 03-25-2025.
Critical: None observed.
Non-critical: